geoeg_logo_b

BELOW / subsurface

Upper one

OVERVIEW
Location

Warsaw, Poland


Year

2021


Scale

Building


Services

Schematic design


Client

The tower Upper One is an emblematic intervention designed by Buro Happold Engineering. The tower will accommodate 34 floors of offices and 17 floors of hotels for a total of 35’940 m² and 11’000 m² respectively. The building is built upon a parking garage with 5 floors constructed underground.
In this context, GEOEG was involved in the schematic design of a mixed geothermal foundation for the tower. GEOEG provided its expertise to develop the energy, geotechnical, and structural design of a complex geothermal foundation comprising 51 energy barrettes, 7’000 m² of energy walls, and 1’700 m² of energy slabs, which is going to provide renewable heating and cooling to the building 24/7 through the harvesting of shallow geothermal energy from the underground.

project summary

kW of supplied renewable energy

of conditioned spaces